SAFT
CONTRACT VALUE: Contracted to Hodess Construction Corp.
CLASSIFICATION: ISO 6 and -60 Degree C Dewpoint (1/2% RH)
SCOPE: Site QA/QC
DESCRIPTION: Contracted to the construction team to review cleanroom/dryroom design and Perform site QA/QC to insure construction met the requirements and protocol to achieve the design intent.
COMPLETED: 2011
INDUSTRY: Automotive